HOA Management Company Maintenance and Capital Planning Questionnaire
Use this evidence-based questionnaire to compare how HOA management companies inventory common assets, triage requests, control work orders and vendors, coordinate preventive maintenance, connect reserve plans to projects, report performance, and transfer complete maintenance records.
ManageMatch · November 27, 2026A management company can demonstrate a resident maintenance-request button and still leave the board without an operating system for the physical property. The board needs to know who inspects assets, how urgent conditions are triaged, which work requires approval, how vendors are selected, whether preventive work is scheduled, how invoices connect to completed scope, and whether work history can be exported when the contract ends.
Maintenance and capital planning are not one software feature. They connect governing documents, common-element responsibility, asset records, inspections, resident reports, emergencies, work orders, contracts, insurance, budgets, reserves, projects, communications, closeout evidence, and professional judgment. Use this questionnaire to compare the people, process, technology, contract, and proof each finalist will provide.
This guide is general procurement and association-management education, not legal, engineering, building-safety, reserve-study, accounting, insurance, tax, accessibility, public-health, environmental, employment, contract, or software advice. Duties and standards vary by jurisdiction, governing documents, facility, contract, and facts. Product capabilities and service arrangements change. Verify current law, official requirements, professional advice, vendor documentation, proposal terms, and the actual configured system.
1. Define the maintenance scope before comparing software
Ask each finalist to inventory the physical responsibilities it believes are included in the proposal. The list should address buildings, roofs, exteriors, structure, elevators, fire and life-safety systems, plumbing, electrical, HVAC, pools, gates, roads, parking, sidewalks, drainage, landscaping, irrigation, trees, lighting, security systems, amenities, utilities, equipment, and any limited common elements.
For every category, identify:
- association, owner, utility, municipality, developer, or shared responsibility;
- routine inspection and maintenance;
- emergency response;
- resident-request intake;
- regulatory or permit coordination;
- vendor procurement and supervision;
- board approval threshold;
- operating or reserve funding;
- reporting and records; and
- exclusions and extra charges.
Do not score a broad claim such as "full maintenance coordination" until the company maps it to your actual property and contract.
2. Require an asset inventory and responsibility map
Ask how the manager will create or inherit an association-owned asset register. Each material asset should have a stable identifier, location, description, manufacturer and model when relevant, installation or acquisition date, ownership, maintenance responsibility, warranty, expected life, inspection cycle, service vendor, permit or certificate, related reserve component, last action, next action, and record links.
Test difficult boundaries. Ask how the company handles a pipe serving one unit inside a common wall, an owner-maintained balcony with association structural responsibility, a private road with utility easements, a stormwater facility inside landscaping, or equipment shared with another association. Require a method for recording uncertainty and obtaining professional or legal direction rather than forcing every issue into an unsupported answer.
3. Examine the property onboarding inspection
Ask what the finalist will inspect before taking responsibility and who performs the work. A manager's visual walkthrough, engineer's condition assessment, reserve-study site visit, fire inspection, elevator inspection, vendor service report, and insurance-loss-control survey answer different questions.
Request the onboarding plan, including:
- document and plan review;
- physical walkthrough route;
- known defects and active leaks;
- life-safety and access concerns;
- overdue inspections and permits;
- open work orders and projects;
- warranties and service contracts;
- deferred maintenance;
- reserve-study reconciliation;
- photographs and location map;
- board interview; and
- first 30-, 60-, and 90-day actions.
Require the proposal to distinguish included manager work from separately priced engineering, inspection, testing, or consulting.
4. Test resident and board request intake
Have each finalist demonstrate how an owner, resident, director, employee, or vendor reports a condition. AppFolio's current materials describe maintenance requests with photographs, status tracking, vendor work-order access, notes, invoices, and completion updates. Buildium describes resident request tasks, work orders sent to vendors, and resident portals. Vantaca documents work-order action items that progress through defined steps. These are useful product examples, not proof of a finalist's configuration or service.
Test requests by portal, email, telephone, voicemail, text, after-hours line, manager observation, inspection, and board direction. Ask how duplicate reports are merged without losing evidence and how a message sent to the wrong employee enters the official system.
5. Review triage and emergency classification
Ask for the written triage matrix. It should distinguish immediate threats to life or property, urgent service failures, regulatory deadlines, active water intrusion, access or security failures, resident-impacting outages, routine repairs, cosmetic concerns, owner responsibility, warranty claims, insurance events, and capital-planning items.
For each category, define acknowledgment, assignment, escalation, vendor dispatch, board notice, public-agency contact, insurance notice, resident communication, spending authority, documentation, and next update. Run a tabletop for a water leak, elevator entrapment, fire-alarm impairment, electrical hazard, blocked egress, gate failure, storm damage, and suspected gas leak. The manager should call qualified responders, not improvise technical instructions.
6. Inspect work-order structure
Ask the finalist to open a complete anonymized work order. It should identify the association, asset, location, requestor, date and channel, condition, priority, responsibility, access, photographs, assigned employee, vendor, scope, estimate, approval, scheduled date, status, communications, change, completion evidence, invoice, payment status, warranty, follow-up, and close date.
Ask whether status labels have definitions. "Open," "in progress," and "complete" are not useful if one employee uses them for vendor contact and another uses them for finished field work. Require timestamps and responsible owners for every material step. Ask whether history can be altered or deleted and whether the board can see exceptions without viewing private resident details.
7. Follow one request from report through verified completion
Give each company the same scenario: a resident reports recurring water staining near a common roof drain. Ask the finalist to demonstrate intake, triage, history search, asset link, inspection, temporary protection, vendor selection, proposal, approval, access, resident updates, repair, invoice review, photographs, root-cause follow-up, warranty, and closure.
Then add complications:
- the stain returns after closure;
- the contractor says the cause is owner plumbing;
- the board delays approval;
- the amount exceeds delegated authority;
- mold or health concerns are raised;
- the insurer requests notice;
- another building reports the same pattern; and
- the vendor invoice differs from the proposal.
The demonstration should show judgment and escalation, not only screen navigation.
8. Ask how preventive maintenance is built
Request the preventive-maintenance calendar for a comparable property. Determine whether tasks come from manufacturer instructions, approved plans, code and permit requirements, service contracts, inspection reports, reserve-study assumptions, engineering guidance, warranty conditions, insurance recommendations, prior failures, and actual operating experience.
For each recurring task, require asset, purpose, interval, seasonal timing, procedure source, responsible person, vendor, access, parts or supplies, permit or shutdown coordination, resident notice, evidence, expected cost, and escalation for a failed result. Ask who updates the schedule after equipment replacement, a new inspection requirement, a recurring failure, or a change in vendor.
9. Connect work orders to the reserve study
CAI describes reserve studies as budget-planning tools for major maintenance, repair, and replacement of association-responsible components. Its reserve-study guidance also emphasizes preventive maintenance and structural inspections. Ask the manager how routine work history informs reserve-study updates and how the reserve study informs annual maintenance and project planning.
Require a crosswalk between asset IDs, work-order history, inspection findings, reserve components, remaining useful life, current cost, planned year, funding, and open project. The manager should not rewrite a reserve professional's conclusions without authority. It should identify new evidence, explain differences, and route material changes to the board and qualified reserve or engineering professional.
10. Separate operating maintenance from capital projects
Ask how the company distinguishes routine service, corrective repair, emergency stabilization, major maintenance, replacement, improvement, and construction project. The categories affect procurement, approvals, funding, permits, contracts, insurance, accounting, resident communication, and professional involvement.
Test a recurring pump repair that may justify replacement. Ask when the manager stops issuing repair work orders and prepares a capital decision packet. The packet should show failure history, downtime, total repair cost, safety or service impact, inspection findings, remaining useful life, alternatives, proposals, reserve-study position, funding, schedule, permit needs, warranty, and recommendation boundaries.
11. Evaluate vendor qualification and conflicts
Request the vendor-onboarding checklist. It should address legal identity, tax information, licenses or credentials when applicable, insurance, references, sanctions or debarment checks when relevant, safety, emergency capacity, service area, subcontractors, data access, pricing, contract terms, conflicts, gifts, and related-party disclosure.
Ask who owns the preferred-vendor list and whether employees, affiliates, or software partners receive fees, rebates, commissions, markups, referral value, or other consideration. Determine whether an affiliated maintenance company competes on equal terms. Require written conflict disclosure, board approval rules, pricing transparency, and a method for documenting exceptions during emergencies.
12. Compare procurement and proposal analysis
Ask for the procurement policy the manager will apply at each dollar and risk level. Define informal quotes, written bids, requests for proposal, sole-source justification, emergency work, professional services, recurring contracts, and capital projects. Match each route to board authority, governing documents, law, insurance, and project facts.
For competing proposals, require a scope matrix that normalizes quantities, exclusions, allowances, alternates, labor, materials, equipment, schedule, warranty, permits, insurance, bonds when appropriate, cleanup, disposal, access, resident impact, change-order terms, and closeout. The lowest total on a proposal cover page is not an apples-to-apples analysis.
13. Inspect contract and service-agreement controls
Ask who drafts, reviews, signs, stores, renews, and terminates vendor agreements. The contract register should include vendor, service, asset, start, expiration, renewal, notice deadline, price escalation, insurance expiration, license or credential expiration, deliverables, service frequency, performance measures, termination, and document location.
Require alerts far enough ahead of automatic renewals and budget season. Ask whether the manager can bind the association, what delegated authority applies, when counsel or another professional is recommended, and how signed contracts are compared to invoices and work orders. A scanned contract in a folder is not a contract-control process.
14. Verify scope, approval, and change controls
For every non-routine job, require a written scope tied to the asset and condition. Record the estimate, budget account, funding source, board or delegated approval, permit question, schedule, access, resident notice, and expected completion evidence before dispatch.
Ask how field changes are handled. A vendor should not expand scope through a telephone conversation that never reaches the board record. The process should capture changed condition, reason, price, schedule effect, alternatives, urgency, approval, and revised forecast. Emergency authority should be limited, documented, and reported promptly rather than used to bypass ordinary governance.
15. Review invoice-to-work verification
Ask the finalist to trace a paid invoice back to the work order, contract, approval, field evidence, coding, and bank transaction. Verify vendor, invoice number, service dates, asset, scope, quantity, rate, materials, tax, credits, prior billing, retainage when used, change orders, and completion evidence.
Define who confirms physical completion and who approves payment. An accounting employee should not certify a roof repair from an invoice description. A property manager should not change financial coding without the accounting workflow. Require separation appropriate to the association's size and a documented exception when ordinary separation is impossible.
16. Examine inspections, permits, and compliance calendars
Ask for one calendar that consolidates recurring official inspections, permits, certificates, tests, service requirements, and renewal dates. It may include elevators, fire systems, pools, backflow devices, boilers, stormwater facilities, building systems, access equipment, or other property-specific items.
For every item, record authority, asset, requirement source, responsible professional, due date, appointment, access, report, findings, correction deadline, completion evidence, payment, certificate, posting or communication, retention, and next due date. Require a supervisor alert for overdue items and a board report that distinguishes scheduled, completed, failed, corrected, and unresolved.
17. Test project management depth
Ask what changes when a work order becomes a project. Require a project register with scope, board authority, budget, funding, design professional, permits, procurement, contract, schedule, submittals, meetings, pay applications, change orders, testing, inspections, insurance, resident communication, risks, forecast, punch list, warranties, and closeout.
Identify what the base management fee includes. Determine whether project coordination is billed by percentage, hourly rate, fixed fee, or separate agreement; what work triggers the fee; whether affiliated vendors are used; and which engineering, construction-management, or owner's-representative work remains outside the manager's competence and contract.
18. Evaluate owner and resident communication
Ask how maintenance status reaches affected residents without disclosing private information or making unsupported promises. Define acknowledgment, access scheduling, outage notice, project update, delay, closure, reopening, and post-work follow-up. Identify which messages require board, technical, legal, insurance, or public-agency review.
Test an owner who cannot use the portal, a tenant whose landlord is unreachable, an accommodation request, a contractor needing unit access, and a resident disputing that work is complete. The manager should maintain one official work history while using practical channels for people who need alternatives.
19. Inspect maintenance performance reporting
Request a sample monthly report with:
- requests received, open, completed, and reopened;
- work-order aging by priority and status;
- emergency and after-hours events;
- preventive tasks due, completed, missed, and failed;
- inspections, permits, findings, and corrections;
- repeat failures by asset or location;
- vendor response, completion, and callback performance;
- estimates and approvals pending;
- project schedule and forecast;
- operating and reserve budget variance;
- contract and warranty deadlines;
- incidents, claims, and unresolved risk; and
- board decisions required.
Ask the finalist to trace summary numbers to anonymized source records. Metrics should reveal risk and follow-through, not reward quick closure without verification.
20. Compare technology without buying a feature list
Current vendor materials show useful workflow possibilities. AppFolio describes maintenance requests, vendor estimates, work-order details, invoices, notes, photographs, and completion through a vendor portal. Buildium describes resident requests, tasks, work orders, and vendor communication. Vantaca documents action-item steps from request through provider assignment, follow-up, and completion.
Ask each finalist to demonstrate the exact product, edition, permissions, configuration, integrations, and operating procedure proposed for your association. Determine who pays for the system, who administers it, where data is stored, what mobile functions work, which automations are enabled, how outages are handled, and what the association can export. Vendor marketing is not a service commitment.
21. Protect records, security, and portability
Classify plans, keys, alarm information, access codes, resident data, photographs inside units, insurance material, legal advice, incident records, vendor banking, and employee information. Require least-privilege access, individual accounts, multifactor authentication where available, activity history, offboarding, approved devices, secure sharing, retention, and incident response.
At termination, the association should receive the asset register, responsibility map, request history, work orders, inspection and permit records, contracts, vendor files, proposals, approvals, invoices, photographs, maintenance calendar, reserve crosswalk, project files, warranties, communications, credentials, and open-item report in usable formats. Ask for a sample export before signing.
22. Put the maintenance operating model into the contract
Translate proposal language into defined duties. Address:
- inspections and property visits;
- request intake and after-hours coverage;
- triage, response, escalation, and board notice;
- delegated spending authority;
- preventive-maintenance administration;
- vendor qualification, bidding, conflicts, and markups;
- work orders, completion evidence, and invoice review;
- permits, official inspections, and correction tracking;
- reserve-study and capital-planning coordination;
- project-management scope and fees;
- resident communication and access;
- records ownership, security, retention, and export;
- staffing, backup, supervision, and performance reports; and
- transition assistance.
Avoid promises such as "proactive maintenance" without defining inspections, calendar ownership, deliverables, evidence, limits, and price.
23. Run a scored maintenance demonstration
Give each finalist the same anonymized scenarios:
- Receive and triage an active leak after hours.
- Convert a resident report into a controlled work order.
- Obtain and compare three non-identical proposals.
- Document an emergency authorization above the ordinary limit.
- Close a repair with photographs, invoice, warranty, and follow-up.
- Reopen a recurring failure and connect it to asset history.
- Identify an overdue official inspection.
- Connect a replacement decision to the reserve study.
- Report work-order aging and vendor performance to the board.
- Export the complete asset and maintenance record for transition.
Score factual accuracy, triage, authority, resident experience, vendor control, evidence, financial integration, reporting, security, portability, and recognition of professional boundaries.
24. Call references with maintenance-specific questions
Ask references:
- Does the manager find problems before residents report them?
- Are urgent conditions escalated reliably after hours?
- Can the board see what is open, late, disputed, or waiting for approval?
- Are vendors held to written scope, schedule, and completion evidence?
- Do invoices match the work actually completed?
- Is preventive maintenance kept current?
- Are permits and official inspections tracked through correction?
- Does work history improve reserve and project planning?
- Are project fees and vendor markups transparent?
- What happens when the assigned manager is absent or replaced?
- Did the association receive complete maintenance records at transition?
Compare references with the live demonstration, sample report, staffing model, export, and contract. A good anecdote does not replace evidence about the team proposed for your association.
Decision record for the board
For each finalist, retain:
- property scope and responsibility map;
- asset-register and onboarding sample;
- triage and emergency matrix;
- work-order demonstration results;
- preventive-maintenance calendar;
- inspection and permit calendar;
- reserve-study crosswalk;
- vendor qualification and procurement process;
- contract and conflict disclosures;
- invoice-to-work test;
- project-management scope and fees;
- sample performance report;
- security and export evidence;
- reference notes;
- contract exceptions; and
- board score and rationale.
The strongest company is not the one that closes the most tickets. It is the one that helps the board understand its assets, identify risk, authorize the right work, preserve reliable evidence, connect maintenance to long-term funding, communicate clearly, and retain a complete property record the association controls.
Sources and verification notes
- CAI: Explanation of Reserve Study Standards
- Foundation for Community Association Research: Best Practices - Reserve Funding
- CAI HOAresources: Responsibilities of a Community Manager
- AppFolio: Community Association Management Software
- AppFolio: Vendor Portal Overview
- Buildium: HOA and Community Association Management Software
- Buildium: Maintenance and Communication
- Vantaca Library: Processing a Work Order
- Vantaca Library: Vendor Action Items
Industry and product materials were reviewed November 27, 2026. CAI and the Foundation are used for industry and reserve-planning framing. Vendor sources describe current product capabilities and are not endorsements or proof of a particular management company's configuration. Verify the finalist's live workflow, permissions, staffing, contract, pricing, records, and exports. Use current official law, governing documents, permits, qualified professionals, and association counsel for property-specific duties.
Put this into practice
ManageMatch turns one private request into up to five proposals from local property management companies covering your exact area and property type — free for owners and boards.